REVISION : Trial paper 2 [2008]- smt muadzam shah

BAHAGIAN A

SECTION A

1 Rajah 1 menunjukkan pelan lakaran grid kontor yang mengandungi kedudukan stesyen grid, alat aras, batu aras BA1 dan bacaan staf.

Figure 1 shows the sketch plan of contour grid include the location of grid stations, leveling instrument, bench mark BM1 and staff reading.





Rajah 1



Figure 1

(a) Terangkan aktiviti yang perlu dilakukan mulai penandaan stesyen grid hingga pembukuan . [ 12markah]

Explain the activities that need to do begin from locate grid station up to booking. [ 12 marks]





(b) Lakukan pembukuan dalam Lampiran 1. [ 8 markah ]

Write the booking in Appendix 1 [ 8 marks ]



2. Rajah 2 menunjukkan carta alir proses tawaran .



Figure 2 shows the flow chart of tender process .




Rajah 2



Figure 2

a) Nyatakan satu alasan mengapa proses tawaran perlu dilaksanakan. [2 markah]

List down a reason why tender process need to be done. [ 2 marks ]



b) Terangkan aktiviti-aktiviti dalam proses tawaran pada peringkat berikut :

Explain the activities in tender process at the following stages:


i) Iklan Tawaran [ 4 markah ]

Tender Advertisement [ 4 marks ]




ii) Pemilihan Tawaran [ 10 markah ]



Tender Choose [ 10 marks ]



iii) Penerimaan Tawaran [ 4 markah ]



Tender Acceptance [ 4 marks ]









BAHAGIAN B



SECTION B








3. Jadual 1 menunjukkan data ujian Proba Mackintosh yang dilaksanakan di tapak bina.



Table 1 shows Mackintosh Probe test data that conducted at site.



Jadual 1

Table 1



a) i) Lengkapkan bilangan hentaman bertokok dalam Lampiran 2 [ 2 markah ]

Complete the cumulative numbers of blows in Appendix 2 [ 2 marks ]







ii)Plot graf kedalaman melawan bilangan hentaman bertokok dengan menggunakan skala paksi y, 1cm: 0.3m dan paksi x, 1cm : 50 bilangan hentaman bertokok. [10 markah]

Plot depth versus cumulative numbers of blows by using scale for y axis,




1cm : 0.3m and x axis, 1cm: 50 cumulative numbers of blows [10 marks ]




b) Hitung dan tentukan keupayaan galas tanah pada kedalaman 1.8 meter. [ 8 markah ]
Calculate and determine bearing capacity at 1.8 meter depth [ 8 marks ]

Gunakan graf piawai pada Lampiran 3 bagi menjawab soalan 3b.
Use standard graph at Appendix 3 to answer question 3b


4. Rajah 3 menunjukkan pelan satu persimpangan jalan termasuk data kadar aliran trafik (pcu/hr) dan ukuran lebar jalan (W). Persimpangan ini berfungsi dalam 2 fasa dan masa hilang (L) adalah 10 saat.

Figure 3 shows a road junction with traffic light signals include traffic flows data (pcu/hr)
and road width (W). This junction function in 2 phase and loss time (L) is 10 seconds.


(a) Dengan membina jadual fasa, Hitung :
By using phase table, calculate :


(i) Jumlah kadar aliran trafik (q) [4 markah]
The total of traffic flow (q) [4 marks]


(ii) Kadar aliran tepu (S) [2 markah]
The saturated flow (S) [2 marks]


(iii) Nisbah kadar aliran trafik (y) [4 markah]
The ratio of traffic flow (y) [4 marks]



(iv) Kadar penggunaan persimpangan (Y) [2 markah]
The rate of usage of the intersection (Y) [2 marks]

(b) Hitung masa kitaran optimum (Co) [4 markah]

Calculate the optimum cycle time (Co) [4 marks]



(c) Senaraikan 4 alasan mengapa lampu isyarat diperlukan pada persimpangan? [4 markah]

List down 4 reason why are traffic light signals needed at that intersection? [4 marks]





BAHAGIAN C

SECTION C

5. Rajah 4 menunjukkan sebahagian struktur kerangka bangunan dalam pembinaan. Beberapabahagian struktur bangunan itu mengalami kerosakan.

Figure 4 shows apart of building frame structure under construction. Certain parts of the structure have some damaged.



Rajah 4



Figure 4



(a) Senaraikan 2 jenis kerosakan serius yang berlaku pada struktur itu. [2 markah]

List down 2 types of serious damage happen at the structure. [ 2 marks ]


(b) Terangkan bagaimana kerosakan itu dapat dielakkan dari aspek berikut

Explain how to prevent the damage by following aspect :

(i) Bahan [ 8 markah ]


Material [ 8 marks ]





(ii) Kaedah Penyediaan [ 8 markah ]



Method of preparation [8 marks ]





(iii) Kuring [ 2 markah ]



Curing [ 2 marks ]


6. Rajah 5 menunjukkan profil kedudukan taman perumahan P yang mengandungi 500 buah rumah dan taman perumahan sedang dalam pembinaan Q yang mengandungi 700 buah rumah. J dan K adalah 2 lokasi cadangan tangki perkhidmatan yang perlu dibina.



Figure 5 shows a profile of housing area P which has 500 houses and under construction of housing area Q which has 700 houses. J and K are 2 locations a proposed site of service tank.






Rajah 5

Figure 5

Berbantukan lakaran, cadang dan terangkan alasan :

By using sketching, propose and explain:




(a) Lokasi kedudukan tangki perkhidmatan yang sesuai. [6 markah]
An appropriate location of service tank. [6 marks]


(b) Kaedah pengagihan air yang yang sesuai. [8 markah]
An appropriate water distribution method [8 marks]


(c) Sistem perpaipan [6 markah]
Piping system [6 marks]











  1. Rajah 6 menunjukkan bangunan dua tingkat yang akan dibina. Sistem penyaliran najis dan air sisa dari bangunan ini perlu dirancang dengan berkesan. Kawasan ini kerap mengalami taburan hujan yang tinggi.



























Figure 6 shows a double storey building that will be construct. Waste and waste water drainage system from the building must be plan effectively. This area has received a heavy rain frequently.




























































































































































































































































































































































































































































































Rajah 6














Figure 6










































Cadangkan sistem yang sesuai dan nyatakan alasan bagi perkara berikut :














Suggest the suitable system and state the reason for the following matter:




























(a) Paip lekapan [10 markah]




























Fixture pipe [10 marks]










































(b) Paip salir [10 markah]




























Drainage pipe [10 marks]










































Sila gunakan lakaran untuk membantu jawapan anda.














Please use sketches to support your answer


































































































Lampiran 1














Appendix I





























































































































































































































































































































































































































































































































































































































































































































































































Catatan






Remarks






BA1 – AL = 19.800 m BM1 – RL = 19.800 m














A2 AL = 20.505 m RL = 20.505 m









Rantaian






Chainage



















Aras Laras






Reduce Level



















Tinggi Kolimatan






Height of Colimation



















Pandangan Hadapan






Foresight



















Pandangan Antara






Intermediate sight



















Pandangan Belakang






Backsight




























Lampiran 2 Appendix 2



















































































































































Kedalaman (m)






Depth (m)






Bil. Hentaman/0.3m






Number of Blows / 0.3m






Bil. Hentaman Bertokok






Cumulative Number of Blows












0.0 – 0.3












0.3 – 0.6












0.6 – 0.9












0.9 – 1.2












1.2 – 1.5












1.5 – 1.8












1.8 – 2.1












2.1 – 2.4












2.4 – 2.7












2.7 – 3.0












3.0 – 3.3












3.3 – 3.6












3.6 – 3.9












3.9 – 4.0












15












10












8












16












42












50












52












48












56












54












90












95












105












400




































































































































Lampiran 3 Appendix 3














































































































































































































































































































































































































































































































































































































































































































Faktor ; penyebab atau perkara-perkara yang akan memberi kesan atau membawa akibat














Akibat : kesan dari sesuatu sebab atau kejadian














Aktiviti / proses/ prosedur ;














perkara-perkara yang berlaku mengikut urutan atau tertib ( perlu disertakan alat/jentera /bahan/ukuran/ kadar/ nisbah/ masa/ spesifikasi)